Volume 40 - Issue 38 - September 23, 2021
State of Kansas
Department of Transportation
Notice to Contractors
Electronic copies of the letting proposals and plans are available on the Kansas Department of Transportation (KDOT) website at https://kdotapp.ksdot.org/Proposal/Proposal.aspx. The website will allow the contractor to request approval from KDOT to bid as a prime contractor and be included on the “Bid Holders List,” or to be included on the “Non-Bid Holders List” as a subcontractor/supplier. KDOT’s approval is required to bid as a prime contractor. To bid as a prime contractor, KDOT needs to be notified of the intent to bid no later than the close of business on the Monday preceding the scheduled letting date. Failure to obtain prior approval to bid as a prime contractor on any projects listed below will be reason to reject your bid. The Secretary reserves the right to reject bids that do not comply with all requirements for preparing a bidding proposal as specified in the 2015 edition of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction.
KDOT will only accept electronic internet proposals using the Bid Express website at http://www.bidx.com until 1:00 p.m. (CST) October 20, 2021. The KDOT bid letting will be conducted remotely by audio broadcast ONLY at 3:00 p.m. (CST) Wednesday, October 20, 2021. To join the conference call, dial 866-620-7326 and enter conference code 5895748207. KDOT has tested the process, but in the event of an unforeseen issue, KDOT will provide updates.
Each bidder shall certify that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. This certification shall be in the form of a required contract provision provided by the state to each prospective bidder. Failure to complete the required contract provision and certify the completeness of the preceding statement when electronically signing the proposal will make the bid nonresponsive and not eligible for award consideration.
District One – Northeast
Atchison – 3 C-4963-01 – Major collector rural secondary routes 24, 201, 823, 1288, north-south leg of 1290, 1400, and 1592, signing, 30.0 miles. (Federal Funds)
Atchison – 3 TE-0489-01 – Main Street, from 10th Street to 2nd Street in Atchison, landscaping and beautification, 0.8 mile. (Federal Funds)
Johnson – 56-46 KA-5420-01 – US-56, from Sycamore Street to 275 feet west of Old Highway 56 in Gardner, pavement reconstruction, 1.0 mile. (Federal Funds)
Johnson – 69-46 KA-6121-01 – US-69, bridge #096 over W. 179th Street on US-69 southbound located 4.4 miles north of the Miami/Johnson County line in Overland Park, bridge repair. (Federal Funds)
Osage – 70 C-4988-01 – Bridge over South Branch Wakarusa Creek on S. Hoch Road located 8.5 miles west and 2.8 miles north of Carbondale, bridge replacement, 0.2 mile. (Federal Funds)
Wyandotte – 05-105 KA-5796-01 – K-5, at six locations beginning at N. 18th Street east approximately 1.2 miles to 1,600 feet northeast of N. 10th Street, guard fence, 1.2 miles. (Federal Funds)
District Two – North Central
Chase – 50-9 KA-6164-01 – US-50, from approximately 130 feet west of the west city limits of Strong City east to approximately 600 feet east of the east city limits of Strong City, surfacing, 0.7 mile. (Federal Funds)
Ellsworth – 14-27 KA-6288-01 – K-14, from the Rice/Ellsworth County line north to the south city limits of Ellsworth, milling and overlay, 14.8 miles. (Federal Funds)
Geary – 77-31 KA-2367-05 – US-77, from approximately 158 feet south of US-77/Old Milford Road, north to the north US-77/K-57 junction, grading and surfacing, 2.5 miles. (Federal Funds)
Geary – 77-31 KA-4638-02 – US-77, from approximately 1,758 feet north of Rucker Road north to the Geary/Riley County line, guard fence, 12.9 miles. (Federal Funds)
Geary – 31 TE-0495-01 – 8th Street from Eisenhower Drive to Garfield Street, Garfield Street from 7th Street to 8th Street, and 7th Street from Garfield Street to K-57 in Junction City, pedestrian and bicycle paths, 0.5 mile. (Federal Funds)
Lincoln – 53 C-4990-01 – Bridge over Beaver Creek on Kale Lane located 0.7 mile south and 2.3 miles east of Lincoln, bridge replacement, 0.2 mile. (Federal Funds)
Washington – 36-101 KA-3244-01 – US-36, from the west city limits of Washington, east to the east city limits of Washington, pavement reconstruction, 0.7 mile. (Federal Funds)
District Three – Northwest
Decatur – 383-20 KA-6322-01 – K-383, beginning at the Sheridan/Decatur County line to the west city limits of Jennings, milling and overlay, 14.1 miles. (Federal Funds)
Graham – 24-33 KA-3930-01 – US-24, bridge #002 over Antelope Creek Drainage located 3.56 miles east of the Sheridan County line, bridge replacement. (Federal Funds)
Graham – 24-33 KA-3960-01 – US-24, bridge #005 over South Fork Solomon River Drainage located 3.47 miles east of K-85, bridge replacement. (Federal Funds)
Graham – 24-33 KA-3961-01 – US-24, bridge #006 over South Fork Solomon River Drainage located 4.79 miles east of K-85, bridge replacement. (Federal Funds)
Osborne – 181-71 KA-3938-01 – K-181, bridge #042 over Twin Creek located approximately 6 miles south of US-24, bridge replacement. (Federal Funds)
Russell – 84 C-4986-01 – Major collector roads located north of I-70 and east of US-281, signing, 90.0 miles. (Federal Funds)
Sheridan – 383-90 KA-6323-01 – K-383, from the US-83/K-383 junction to the Decatur/Sheridan County line, milling and overlay, 1.3 miles. (State Funds)
Statewide – 106 KA-6354-01 – K-186, from the beginning of the route north to the US-24/K-186 junction; K-188, from the beginning of the route north to the US-24/K-186 junction; and US-24, from the US-24/US-83 junction east to the Sheridan/Thomas County line, milling and overlay, 13.0 miles. (State Funds)
District Four – Southeast
Cherokee – 11 C-5002-01 – Bridge over Center Creek on SE 110th Street located 1.0 mile west of Faulkner, bridge replacement, 0.2 mile. (Federal Funds)
Crawford – 19 C-5003-01 – Bridge over Tributary to Hickory Creek on S. 20th Street located 16.7 miles south and 0.2 mile east of Walnut, bridge replacement, 0.2 mile. (Federal Funds)
Labette – 59-50 KA-3903-01 – US-59, bridge #008 over Labette Creek located 5.69 miles northwest of the east US-160 junction, bridge replacement. (Federal Funds)
Montgomery – 63 C-5048-01 – RS-818 at the Verdigris River near 3800 Road, grading and surfacing, 0.3 mile. (Federal Funds)
Statewide – 106 KA-6435-01 – Various locations in the counties of Allen, Bourbon, Chautauqua, Cherokee, Coffey, Elk, Franklin, Labette, Linn, Miami, Montgomery, and Woodson, milling. (State Funds)
District Five – South Central
Barber – 160-4 KA-6139-01 – US-160, from the Barber/Comanche county line east to the US-281/US-160 junction, special maintenance, 22.4 miles. (State Funds)
Barton – 5 KA-6290-01 – US-281, from the west US-281/K-4 junction east to the east US-281/K-4 junction; K-4 (part 1), beginning at the Rush/Barton county line east to the west US-281/K-4 junction; and K-4 (part 2), beginning at the east US-281/K-4 junction east to the Barton/Rice county line, milling and overlay, 30.7 miles. (Federal Funds)
Barton – 56-5 KA-6292-01 – US-56, from the east city limits of Great Bend east to the west city limits of Ellinwood, milling and overlay, 8.1 miles. (Federal Funds)
Butler – 8 C-4998-01 – Bridge over Little Walnut River on SW 157th Terrace located 3.8 miles east and 0.5 mile north of Gordon, bridge replacement, 0.3 mile. (Federal Funds)
Pratt – 76 KA-6223-01 – US-281, from the Barber/Pratt County line north to 482 feet north of N.W. 60th Street excluding the City of Pratt; US-54, from the K-61/US-54 junction east 4.04 miles to SE 25th Avenue; and K-61, from the US-54/K-61 junction north approximately 0.7 mile to Maple Street at the 2-lane/4-lane transition, milling and overlay, 24.1 miles. (State Funds)
Sedgwick – 96-87 KA-6136-01 – K-96, bridge #284 over Little Slough Creek located 0.61 mile east of Tyler Road; and bridge #286, over Ridge Road located at the K-96/Ridge Road junction, bridge repair, 0.1 mile. (Federal Funds)
District Six – Southwest
Hamilton – 50-38 KA-6293-01 – US-50 from the east city limits of Syracuse to the Hamilton/Kearny County line, milling and overlay, 11.3 miles. (Federal Funds)
Hamilton – 50-38 KA-6295-01 – US-50, from the Colorado/Kansas state line southeast to the east city limits of Syracuse, milling and overlay, 17.2 miles. (Federal Funds)
Kearny – 50-47 KA-6294-01 – US-50, from the Hamilton/Kearny County line east to the west city limits of Lakin, milling and overlay, 15.0 miles. (Federal Funds)
Lane – 04-51 KA-6299-01 – K-4, from the east K-23/K-4 junction east to the Lane/Ness County line, overlay, 12.3 miles. (Federal Funds)
Meade – 54-60 KA-6296-01 – US-54, from the east city limits of Meade northeast to the Meade/Clark County line, milling and overlay, 15.4 miles. (Federal Funds)
Ness – 04-68 KA-6300-01 – K-4, beginning at the Lane/Ness County line east to the US-283/K-4 junction, overlay, 19.0 miles. (Federal Funds)
Seward – 83-88 KA-6297-01 – US-83, beginning at the US-83/US-160 junction north to the Seward/Haskell County line, ultra-thin bonded asphalt surfacing, 8.0 miles. (Federal Funds)
Julie Lorenz
Secretary
Doc. No. 049454